Crown Metropol Infinity Suite

The scope for our Infinity Suite project included two separate components; the full demolition of the “His & Hers” bathrooms and the full demolition and refurbishment of the 80m2 balcony and entertainment area including structural works to the raised central platform area, new stainless steel and glass balustrading to the curved walls.

The challenge was working within the premium areas of the Crown entertainment complex surrounded by occupied first-class rooms and with the Sky Lounge gaming area functioning above.

The 8 week pre-construction period included detailed planning activities, development of shop drawings and a material samples submission process to ensure the shortest possible time on site. The process required close working relationships between the client, Blainey North Architects, and Swan Group. 

The result was a successfully delivered project with exceptionally high quality.

Back to all Projects