SCGH G-Block Endoscopy Clean Fitout

Swan Group was selected to deliver the reconfiguration project within a confined clinical environment on Level 7 of the G-Block at Sir Charles Gairdner Hospital based upon extensive healthcare experience and understanding. 

The works incorporated the Level 7 endoscopy clean & disinfecting area adjacent to fully live and occupied wards. 

Swan Group’s delivery team successfully implemented the newlyestablished SCGH Infection Control Procedures which was the first time a contractor had done this. 

Along with the fitout works, the project included the installation of new medivator units and 5 drying cabinets for fibre optic endoscopes and colonoscopies. 

There was also the requirement for upgrade works in the adjoining patient holding area, to allow for a macerator unit to be installed between two toilet cubicle areas. 