Shell Durack Centre

The new fit out for Shell at the ground floor of the Durack Building II was completed while integrating base build mechanical services and existing elements of the building fabric.

As per the design brief, we have delivered the project to a very high standard and in line with the 4 star Green Star rating.

The project had a number of challenges, which included multiple engineering issues that required rapid redesign and delivery to maintain program.

The fit out was carried out under the global Shell HSSE framework ( Goal Zero ). All personnel and contractors complied, and there were no incidents following the Shell “12 lifesaving rules” mandate and Goal Zero was maintained.

Back to all Projects