Sort By
  • All
  • Commercial
  • Education
  • Financial
  • Hospitality
  • Healthcare
  • Architectural Finishes
Curtin Connect B.102

Curtin Connect B.102

Soon after the completion of B.200B, Swan Group handed over the next stage of Curtin Connect, Building 102. 

Jones Day

Jones Day

Western Australia’s most prestigious address is now home to one of the world’s leading law firms, Jones D

Forrest Centre EOT & Gymnasium

Forrest Centre EOT & Gymnasium

The Forrest Centre now boasts outstanding End of Trip facilities and a new Gymnasium for the tenants to rival Perth&r

Holiday Inn Perth

Holiday Inn Perth

Holiday Inn Perth received a complete renovation throughout 2015 with Swan Group engaged to deliver the final compone

SAE Institute Perth

SAE Institute Perth

The complete construction and fitout of SAE Institute’s new facility on Roe Street, Northbridge was completed t

Curtin Connect B.200B

Curtin Connect B.200B

The first major component to reach completion under Swan Group’s Curtin Connect project was Building 200B which

108 St Georges Terrace EOTF

108 St Georges Terrace EOTF

Swan Group’s End of Trip Facility portfolio was further expanded with the successful delivery of the EoT &

Crown Promenade Perth

Crown Promenade Perth

Swan Group strengthened an already close relationship with Crown during the demanding and very involved refurbishment

220 St Georges Terrace

220 St Georges Terrace

The transformation of 220 St Georges Terrace consisted of the upgrade and refurbishment of the ground floor (bot

Central Park L42-L47 Make Good

Central Park L42-L47 Make Good

Swan Group delivered the make good and upgrade works across Levels 42, 43, 44, 45, 46 & 47 within Central Park fo

Crown Metropol Link

Crown Metropol Link

In anticipation of the opening of Western Australia’s first 6 Star hotel, Crown Towers, Swan Group transformed

ECU Mt Lawley Lecture Theatre Upgrade

ECU Mt Lawley Lecture Theatre Upgrade

A tired lecture theatre at Edith Cowan University’s Mt Lawley Campus was in need of a facelift, and Swan Group

CBA Kings Square 2

CBA Kings Square 2

Swan Group successfully fitted out and handed over the new Commonwealth Bank of Australia (CBA) branch within Kings S

Aurecon

Aurecon

In 2014, Swan Group was awarded the refurbishment and fitout of the Aurecon offices across 3 floors at 863 Hay Street

Hollywood Hospital Anaesthetic Store

Hollywood Hospital Anaesthetic Store

Extending a long-standing relationship with Hollywood Hospital and Ramsay Healthcare, Swan Group delivered the refurb

Exchange Tower Bike Store

Exchange Tower Bike Store

Construction of the new Bike Store formed the second phase of the Exchange Tower End of Trip Facility (EOTF) works.&n

CBA Whitford City

CBA Whitford City

The existing CBA retail branch in Westfield Whitford City was entirely refurbished and downsized from 460m2 to 320m2

Quadriplegic Centre

Quadriplegic Centre

Swan Group refurbished and expanded the existing facilities at the Quadriplegic Centre under a Design & Construct

Travel & Sports Australia

Travel & Sports Australia

Swan Group was tasked with the fitout of Travel & Sports Australia's newly constructed bu

SCGH V-Block Communications Service

SCGH V-Block Communications Service

The V-Block Telecommunications Centre sits in the centre of the Nedlands QEII Medical Centre and has housed the Contr

Norfolk Chapel

Norfolk Chapel

After a thorough planning exercise during the tender phase, Swan Group was awarded the Norfolk Chapel Condolence Loun

CBA Maddington

CBA Maddington

Under our single select agreement with CBA & Bankwest, our dedicated rollout team fitted out the new Maddington C

WAIFS New Fitout

WAIFS New Fitout

Swan Group delivered the fitout of WAIFS’s (West Australian Institute of Further Studies) new teaching faciliti

Crown Promenade Feature Paneling

Crown Promenade Feature Paneling

Swan Group returned to Crown Promenade for some further minor works after delivering the complete refurbishment of th

Hollywood Hospital CSSD

Hollywood Hospital CSSD

Swan Group was entrusted with the essential refurbishment and upgrade project within Hollywood Hospital’s Centr

ALDI Wattle Grove

ALDI Wattle Grove

Swan Group successfully delivered one of the many new WA ALDI stores in Wattle Grove, Perth with Actus Associates.&nb

CBA Joondalup Business & Premier Banking

CBA Joondalup Business & Premier Banking

Swan Group delivered the outstanding CBA Business and Premier Banking Branch under their single select Design & C

Winning Appliances Billi Display

Winning Appliances Billi Display

Swan Group’s Architectural Finishes division carried out the complete manufacture of a bespoke Billi display be

Exchange Tower EOT

Exchange Tower EOT

Swan Group was awarded the project to construct a new End of Trip Facility within Exchange Tower by Knight Frank whic

Esplanade Hotel Port Hedland

Esplanade Hotel Port Hedland

Swan Group was awarded this project direct from the client, The Esplanade Hotel, under the guidance of Kish Consultin

CBA Bull Creek

CBA Bull Creek

CBA Bull Creek, sitting on the corner of Bull Creek Shopping Centre, was rejuvenated with a complete refurbishment in

Hollywood Hospital Day Surgery

Hollywood Hospital Day Surgery

Our recent refurbishment of Level 2, Sylvia Perry Wing at Hollywood Hospital created a new Day Surgery incorporating

Newspaper House Fitout

Newspaper House Fitout

Working closely with Hassell Architects and the Aspen Group property team, Swan Group produced a high quality fitout

Alantis Beach Sales Office

Alantis Beach Sales Office

The client needed their new sales office turned around in a short timeframe to be able to open the doors to the publi

Exchange Tower Entry Portals

Exchange Tower Entry Portals

Swan Group refurbished both the Ground Floor and Lower Ground Floor Entry Portals at the recently renamed Exchange To

Exchange Tower Building Upgrade

Exchange Tower Building Upgrade

Swan Group has completed a range of projects under the management of Knight Frank in the Exchange Tower Building. Sev

ASX Video Wall

ASX Video Wall

Following the great success of the ASX offices fitout on Level 40 of Central Park, Swan Group was awarded the Constru

Hays Recruiting

Hays Recruiting

The Hays fit-out was a two floor office fit-out in the new Cloisters building on Hay street in Perth. The pr

CBA South Perth

CBA South Perth

Swan Group is on the Commonwealth Bank Retail and Commercial Tender panels for Western Australia, offering complete t

Suncorp

Suncorp

The Suncorp fitout was based on a design and build that incorporated existing furniture as well as the excisting 

Shell Ground Floor Stage 2

Shell Ground Floor Stage 2

This project was a refurbishment of an existing office. It included the demolition of a number of partition wall

Mcleods Barristers & Solicitors

Mcleods Barristers & Solicitors

The client required a functional, modern workspace. Storage was a key priority for staff and this was incorporated in

ASX Fitout

ASX Fitout

ASX required a high-end office fitout to introduce enhanced workspaces and a sleek professional atmosphere reflecting

Crown Bar Extension

Crown Bar Extension

The Crown Atrium Bar refurbishment project consisted of extending the bar area, while keeping a part of the original

KMC House

KMC House

The KMC Project was the first commercial build for Swan group where we managed every step of the process. We are prou

Shell Septimus Roe

Shell Septimus Roe

This project was to refurbish existing premises for Shell. The work included the demolition of partition walls, and t

CBA Bassendean

CBA Bassendean

Swan Group is on the Commonwealth Bank Retail and Commercial Tender Panels for Western Australia, offering complete t

Consolidated Minerals

Consolidated Minerals

This project was a refurbishment of existing premises, with the main focus on the reception and breakout area. The ai

Swan Group Head Office

Swan Group Head Office

Our design brief was to devise a bright, fun space that reflected the Swan Group’s culture and core values; res

Shell Durack Centre

Shell Durack Centre

The new fit out for Shell at the ground floor of the Durack Building II was completed while integrating base build me

Anglo Gold Ashanti

Anglo Gold Ashanti

The project for Anglo Gold Ashanti consisted of a full floor high spec fit out with an open plan office space, multip

ECU Building 8 Refurbishment

ECU Building 8 Refurbishment

Taylor Robinson Architects awarded us this project. The brief was to refurbish the old staff rooms to create a vibran

Bankwest Place

Bankwest Place

The Bankwest Place project at Raine Square was awarded to Swan Group by project managers, Lend Lease who were deliver

BIS Industries

BIS Industries

Our project with IA Group consisted of the full floor fitout over a 3 week period for BIS Industries. 

Crown Metropol Infinity Suite

Crown Metropol Infinity Suite

The scope for our Infinity Suite project included two separate components; the full demolition of the “His &

Crown Convention Centre Lobby & Bathrooms

Crown Convention Centre Lobby & Bathrooms

Swan Group was chosen by Crown Perth to undertake the full refurbishment of the Convention Centre lobby and accompany

Cardio Vascular Services

Cardio Vascular Services

This medical fit out project was awarded to us by Cardio Vascular Services. The objective of the project was to desig

5 Barrack Street

5 Barrack Street

The canopy works at 5 Barrack Street consisted of the refurbishment of the existing façade, installation of a

Holman Fenwick

Holman Fenwick

This design and construct project was brought to us by NMA Commercial Property Consultants. Working closely with the

Runge

Runge

This design and construct project was awarded to us direct by the client, and Express Interior Design Studio was brou