Swan Group was awarded the project to construct a new End of Trip Facility within Exchange Tower by Knight Frank which follwed a number of successful refurbishment and fitout projects within the building. 

The new facility consists of change rooms, toiles, locker areas, a universal access WC and unisex drying room all on the Lower Ground Level.

Works included the construction of a 300mm step-up slab at the rear of the facility to create a separate level for the male and female shower and lockers areas. A complete new Plumbing system was installed throughout to accommodate 15 showers, 9 toilets, 7 hand basins and a drinking fountain. Recessed Strip Lighting and a complete new mechanical air conditioning system was installed throughout. Flushed ceilings and laminated timber bulkheads were installed, tying it all together with the charcoal floor tiling and white ceramic wall tiles. 